Three deck ventilators are strongly fitted from upper to lower deck, one.
Two Cabins 8 x 6 filled before the after cabin house, the others cleared away.
Pipe fitted for sheet cable.
Crook hinges fitted between fore and fore.
Main hatch ways 25 × 10. Two water closets filled abaft Forecastle with shoots to the water, upper deck hatches iron gratinged with 1 Inch bars.
Three ports on each side of upper deck iron gratinged.
A platform at each sentry. Two wooden davits 8 x 8 by crutches.
Deck dubbed and sheathed with 1/2 inch pine over tarred felt, diagonally.
Four bow ports cut 3 × 3 iron barred. Four Stern ports iron barred with 1 inch iron.
Three lead scuppers fitted on each side of both lower decks 3 inches diameter with leather flaps outside and iron lovers.
Cells fitted on each side of deck, partitions of Oregon pine, front of cell gangway for supported on both sides, with blocks and 3 1/2 Inch Manila fall.
The five after Cabins to remain as they are.
A bulkhead fitted in front and a companion cut abaft the Mizen Mast frame.
Centre bar for let into the wood, 2 strong iron rods to pass through.
Swing door to each cell - Scuttles Cut in each cell 18 x 18 iron barred outside, inside secured with a perforated plate let into the wood.
94
Three deck ventilators is x is strongly fitted from upper to lower deck, one
Two Cabino 8 x 6 filled before the after cabin
hause
the others cleared.
away.
pipe fitted for sheet cable
Crok hinses
fitted
betiseen fore and
fore
x
Main hatch ways 25 × 10. Two water closets filled abaft Forecastle with shoots to the
water, upper deck hatches iron gratinged with
1 Inch bars.
Three
porto
orto ent
deck iron gratinged,
on each side of upper-
A platform at each
Sentries Tivo wooden davits 8 x 8
by
Crutches
11. Deck. dubbed and sheathed
with 1/2 inch pine.
x
over
tarred felt,
diagonally Four
bow ports cut 3 × 3 iron barred. Four Stern port's iron barred with 1 inch iron.
Three lead scuppers fitted on each side
of both lown dicks 3 inches diametes with
leather flaps outside and iron lovers.
Fin cells
fitted
on each
each side
of deck,
partitions of I oregon pine, front of cello
gangway for
supported
itted on
on both sides, with blocks
irow
fitted
and 3'/1⁄2 Inch Manila fallo.
The tive after Cabins to remain as
they
are
a
(
bulkhead fitted
in
front
and
a
companion cut abaft the Mizen Mast
frame
Centre bar for
let into the wood 2 a
strong
i iron rods to pass through
Swing door to each cell - Scuttles Cut in each
cell 18 x 18' im barred outarde, inside
secured with a perforated plate let into the